
IB PHYS section 2.3 Work, Energy and Power
An increasing force acts on a metal wire and the wire extends from an initial length l0 to a new length l. The graph shows the variation of force with length for the wire. The energy required to extend the wire from l_0 to l is E. The wire then contracts to half its original extension.
What is the work done by the wire as it contracts?
A student of weight 600N climbs a vertical ladder 6.0m tall in a time of 8.0s. What is the power developed by the student against gravity?
22 W
45 W
220 W
450 W
A car takes 20 minutes to climb a hill at constant speed. The mass of the car is 1200 kg and the car gains gravitational potential energy at a rate of 6.0 kW. Take the acceleration of gravity to be 10 m/s/s. What is the height of the hill?
0.6 m
10 m
600 m
6000 m
The graph shows the variation with distance of a horizontal force acting on an object. The object, initially at rest, moves horizontally through a distance of 50 m. A constant frictional force of
2.0 N
opposes the motion. What is the final kinetic energy of the object after it has moved 50
m
?
A motor of input power 160 W raises a mass of 8.0 kg vertically at a constant speed of 0.50 m/s.
What is the efficiency of the system?
0.63%
25%
50%
100%